Indoor playground and ball pit installation
Most safety problems in a playground start at installation: a badly tightened joint, a gap that can trap a finger or a net that is not properly fixed. We install indoor playgrounds and ball pits with the design approved beforehand, and we hand them over checked.
What we install
- Ball pits and multi-level play structures.
- Play areas for restaurants, hotels and shopping centres.
- Baby parks for the youngest children.
- Extensions and new zones in playgrounds that are already open.
If the playground is not ours, tell us which one it is: we can look into installing it.
What we check during installation
- Structure and joints: tubes, clamps and fixings correctly tightened and checked.
- Nets and protection: properly fixed and free of dangerous gaps.
- Openings and gaps: according to the safety criteria of EN 1176.
- Flooring: impact-absorbing surface suited to the fall height of each element (EN 1177).
- Finish and site cleaning: the playground is ready to open.
How the process works
- You send us the details: plan, photos of the venue, ceiling height and loading access.
- Quote and date: we confirm the scope, the team and the schedule.
- Installation: we install and adjust the playground at your venue.
- Inspection and handover: we check everything and explain how to use and maintain it.
After that, the playground stays with us: maintenance and inspection.
Frequently asked questions
Do you install playgrounds from other manufacturers?
We can look into it. Send us the plans and the parts list of the playground, or photos if you do not have them, and we will tell you whether it is feasible.
What do I need to have ready before installation?
The venue clear, with access for unloading and the measurements confirmed. We tell you anything else needed for your project when we set the date.
How long does installation take?
It depends on the size and complexity of the project. We confirm the lead time in writing in the quote, once we know your venue.